Process (S1 > S5)

Request a Workshop  l  Download Brochure  l  View Workshop Clients  l  What makes Acumen different

Methodology (S1 > S5)

Our proven five-step risk methodology goes beyond traditional risk determination.  Instead, our integrated cost/schedule approach pro-actively targets risk hotspots, reduces cost overruns, accelerates schedules and increases confidence levels.

Quick Turnaround

Acumen offers a structured approach tailored from years of industry experience.  Our five step methodology is proven to be an effective and efficient means of assessing project risk and creating an optimized risk model, with minimal disruption to the team. 

Team Alignment

The Acumen approach allows your team to tackle problems and execute best practices when building, maintaining, analyzing and executing projects, long after we are involved in the project.

Third Party Perspective

An Acumen risk workshop is not an internal replacement, but rather, an outside validated perspective on the project combined with specialized risk analytics expertise. 

Non-Critiqued Schedule
Non-validated, buffered?, questionable realism, target driven?
Critiqued Schedule via Metric Analysis
Structurally sound, no built in contingency, sound logic
Risk Adjusted Schedule
Estimate uncertainty, risk events, calculated contingency
Optimized Target Scenario
Reduced hot spots, lower criticality, higher confidence
Team Validated Optimized Model
Buy-in on S4 optimized model