Schedule Risk Workshop (S1 > S3)

Evolution of a non-validated schedule (S1) through to a fully risk adjusted validated scenario (S3), including mitigation of cost/benefit analysis.

Cost Risk Workshop (S1 > S3)

Evolution of a hierarchical cost estimate (S1) through to a fully risk adjusted validated cost model (S3), including cost contingency and mitigation analysis.

Integrated Cost and Schedule Risk Workshop (Integrated S1 > S3)

Three workshops combined.  This offering includes a schedule risk workshop and a cost estimate workshop followed by an advanced integrated cost/schedule risk model determining the sensitive interaction between cost and schedule overruns.

Cost/Schedule Optimization (S4 > S5)

Taking the S3 risk-adjusted models from the risk workshop(s), this intelligent optimization approach accelerates schedule and reduces cost overruns through a highly focused optimization technique.  Includes an S5 team validated workshop.

Ongoing Review (S1 > S5)

Quarterly updates providing insight into ongoing risk exposure and mitigation effectiveness. 

 

 

Pre-FEED / Appraise

 

FEED / Select

 

Define

 

Execution

 

Operations

Character-istics:

Value proposition
Feasibility studies
  Concept development
Alternate scenarios
  Long lead placement
EPC
Major contracts
  Project
delivery
  Revenue generation
Risk Model: Initial risk appraisal   Capital value analysis   Project risk analysis   Risk performance analysis   Asset lifecycle analysis
Acumen
Phase:
Risk register development   S1 > S3   S1 > S5   S1 > S5   NPV
Probabilistic cashflow
Value-Add: Qualitative basis   Decision support   Baseline analysis   Ongoing risk exposure   Strategic risk Value