Workshop Offerings
Request a Workshop l Download Brochure l View Workshop Clients l What makes Acumen different
Schedule Risk Workshop (S1 > S3)
Evolution of a non-validated schedule (S1) through to a fully risk adjusted validated scenario (S3), including mitigation of cost/benefit analysis.
Cost Risk Workshop (S1 > S3)
Evolution of a hierarchical cost estimate (S1) through to a fully risk adjusted validated cost model (S3), including cost contingency and mitigation analysis.
Integrated Cost and Schedule Risk Workshop (Integrated S1 > S3)
Three workshops combined. This offering includes a schedule risk workshop and a cost estimate workshop followed by an advanced integrated cost/schedule risk model determining the sensitive interaction between cost and schedule overruns.
Cost/Schedule Optimization (S4 > S5)
Taking the S3 risk-adjusted models from the risk workshop(s), this intelligent optimization approach accelerates schedule and reduces cost overruns through a highly focused optimization technique. Includes an S5 team validated workshop.
Ongoing Review (S1 > S5)
Quarterly updates providing insight into ongoing risk exposure and mitigation effectiveness.
|
Pre-FEED / Appraise |
FEED / Select |
Define |
Execution |
Operations |
|||||
|
Character-istics: |
Value proposition Feasibility studies |
Concept development Alternate scenarios |
Long lead placement EPC Major contracts |
Project delivery |
Revenue generation | ||||
| Risk Model: | Initial risk appraisal | Capital value analysis | Project risk analysis | Risk performance analysis | Asset lifecycle analysis | ||||
| Acumen Phase: |
Risk register development | S1 > S3 | S1 > S5 | S1 > S5 | NPV Probabilistic cashflow |
||||
| Value-Add: | Qualitative basis | Decision support | Baseline analysis | Ongoing risk exposure | Strategic risk Value |