Oil & Gas
Contractor
- More leverage during owner negotiations
- Less risk exposure during bidding phase
- Elimination of scheduling flaws
- Insight into owner expectations
- Massively enhanced internal project controls
Owner
- Insight into contractor performance
- Determination of scope/schedule errors
- Powerful means of tracking overall project performance
- Early-warning indicators for risk exposure
- Elimination of cost and schedule overruns
|
|
Construction
Contractor
- More leverage during owner negotiations
- Less risk exposure during bidding phase
- Elimination of scheduling flaws
- Insight into owner expectations
- Massively enhanced internal project controls
Owner
- Insight into contractor performance
- Determination of scope/schedule errors
- Powerful means of tracking overall project performance
- Early-warning indicators for risk exposure
- Elimination of cost and schedule overruns
|
Content on this page requires a newer version of Adobe Flash Player.

|
Federal/Aerospace & Defense
Contractor
- Run internal DCMA 14 Point Assessment pre-tests
- Earned Value Express performance tracking
- Ensure DCMA Tripwire success by running Fuse DCMA metrics
- Use the DCMA UNCEFACT schema directly within Fuse
Government Agency / DCMA
- Review schedule maturity through Fuse 14 Point DCMA metrics
- Track project performance trending over time
- Determine quality of risk models
- Evaluate cost and schedule risk exposure
- Conduct Earned Value/ANSI 748 metric analysis
|
Content on this page requires a newer version of Adobe Flash Player.

|
Information Technology
- Improved schedule maturity
- Elimination of resource constraints
- Determination of performance by discipline & product area
- Simple means of tracking project performance
- Trending of performance
|
Content on this page requires a newer version of Adobe Flash Player.

|