Acumen Fuse comes with over 200 industry standard metrics for project analysis, grouped into metric libraries.  All of these metrics can be re-grouped or edited to meet your needs.  You can also add new metrics or metric libraries using our Acumen Fuse Developers Guide which walks through metric development and formular writing in Acumen Fuse.  Metric libraries include industry standards such as the DCMA 14 Point Assessment as well as Acumen developed best practices.

Download a complete list of the included metrics within Fuse along with their descriptions.  

Download a summary list of the included metrics.  

Basic Metric Library

Open Ends
Logic Density
Critical

Soft Constraints
Hard Constraints
High Float

Negative Float
High Duration
Number of Lags

Max Lag

Advanced Metric Libraries

Characteristics

Total Activities
Milestones
Normal

Summaries
Hammocks
Milestone Ratio

Detail Level
Missing WBS
Riding Data Date

Activities per Million

Duration

Original Duration
Remaining Duration

Rem. Critical Duration
Rem. Non-Critical Duration

Avg Original Duration
Avg Remaining Duration

Ribbon Length
Schedule Overrun

Logic

Missing Predecessors
Missing Successors
Activities With Lags
Open Ends with Constraints

SS Predecessors
SF Predecessors
FF Predecessors
FS Predecessors

Logic Density™
Merge Hotspot
Diverge Hotspot
Logic Hotspot™

Summary Links
Open Start
Open Finish
Open ends without Constraints

Lags

Lags

Leads Maximum Lag Minimum Lag

Constraints

Constraint
As Late As Possible
Finish on or After
Finish on or Before

Must Finish on
Mandatory Finish
Must Start On
Mandatory Start

Start and Finish
Start On or After
Start On or Before
Late Constraints

Early Constraints
Free Float Constraints
Total Float Constraints
Soft & Hard Constraints

Float

Critical
Non Critical
Negative Float

Zero Days Float
0 to 20 Days Float
20 to 30 Days Float

More than 30 Days Float
Average Float
Max Float

 

Status

Underway
Planned
Completed

Days Remaining
Work Done
Completed Milestones

Planned Milestones
Not Completed
Physical % Complete

Duration % Complete
Units % Complete
Wrong Status

Planned

Planned Ahead
Scheduled to Start

Planned Delayed
Scheduled to Finish

Planned on Schedule  

In-Progress

Started Ahead
Started Delayed
In-Progress on Schedule

Days Early
Days Late
Average Days Early

Average Days Late
Average Start Variance
Discrepancy

Actually Started

Completed

Completed Ahead
Completed Delayed
Completed On-Schedule

Accelerated
Days Variance
Days Early

Days Late
Average Days Early
Average Days Late

Average Variance
Actually Finished
Took Longer than Planned

Baseline Compliance Analysis

Scheduled to Start
Scheduled to Finish
Started
Finished

Started on Time
Started Early
Started Late
Finished on Time

Finished Early
Finished Late
Started on time/Finished late
Start Variance

Start Compliance
Finish Variance
Finish Compliance 

Cost

Overrun
$ Cost Underrun
$ Cost Overrun

$ Total Cost
$ Actual Cost
$ Remaining Cost

$ Cost Discrepancy
$ Budget Cost
$ Cost per Day

 

Risk Inputs

Aggressive
Conservative
Questionable Ranges

Broad Risk Range
Scope Uncertainty
No Risk

Average Risk Range
Total Risk Range
No Downside

No Upside
Avg Days Upside
Avg Days Downside

Risk Exposure

High Criticality
Hidden Paths
Risk Hot Spots™

Schedule Risk Drivers
High Contingency
High Cost Drivers

Avg Risk Exposure
Avg Duration Sensitivity
Avg Criticality

Avg Cost Risk

Earned Value

Cost Variance
Schedule Variance
SPI
CPI
Estimate at Complete

EAC (Using CPI Method)
EAC (CPI/SPI)
TCPI (Using BAC)
TCPI(Using EAC)
TCPI (EAC) to CPI

Planned Value
Earned Value
Actual Cost
% Schedule
% Spent

% Spent (EAC)
VAC
BAC

Earned Schedule

SV(t)
SPI(t)

 

 

 

Work/Resources

Overrun
Work Underrun
Work Overrun

Total Work
Actual Work
Remaining Work

Work Discrepancy
Budget Work
Summarized Work

Work per Day
Missing Resources
Resources

Industry Standards

DCMA 14 Point Assessment 

Logic
Leads
Lags
FS Relations

Hard Constraint
High Float
Negative Float
High Duration

Invalid Dates
Resources
Missed Activities

CPLI
BEI

Learn More...
GAO Best Practices
  1. Capturing all Activities
  2. Sequencing All Activities
  3. Assigning resources to all activities
  4. Establishing the duration of all activities
  5. Establishing the critical path for all activities
  6. Integrating schedule activities horizontally and vertically
  7. Establishing the critical path for all activities
  8. Identifying reasonable float between activities
  9. Conducting a schedule risk analysis
  10. Updating the schedule using logic and durations to determine the dates