Basic Metric Library
|
|
Open Ends Logic Density Critical
|
Soft Constraints Hard Constraints High Float
|
Negative Float High Duration Number of Lags
|
Max Lag
|
Advanced Metric Libraries
|
|
Characteristics
|
|
Total Activities Milestones Normal
|
Summaries Hammocks Milestone Ratio
|
Detail Level Missing WBS Riding Data Date
|
Activities per Million
|
|
Duration
|
|
Original Duration Remaining Duration
|
Rem. Critical Duration Rem. Non-Critical Duration
|
Avg Original Duration Avg Remaining Duration
|
Ribbon Length Schedule Overrun |
|
Logic
|
|
Missing Predecessors Missing Successors Activities With Lags Open Ends with Constraints
|
SS Predecessors SF Predecessors FF Predecessors FS Predecessors
|
Logic Density™ Merge Hotspot Diverge Hotspot Logic Hotspot™
|
Summary Links Open Start Open Finish Open ends without Constraints
|
|
Lags
|
|
Lags
|
Leads |
Maximum Lag |
Minimum Lag |
|
Constraints
|
|
Constraint As Late As Possible Finish on or After Finish on or Before
|
Must Finish on Mandatory Finish Must Start On Mandatory Start
|
Start and Finish Start On or After Start On or Before Late Constraints
|
Early Constraints Free Float Constraints Total Float Constraints Soft & Hard Constraints
|
|
Float
|
|
Critical Non Critical Negative Float
|
Zero Days Float 0 to 20 Days Float 20 to 30 Days Float
|
More than 30 Days Float Average Float Max Float
|
|
|
Status
|
|
Underway Planned Completed
|
Days Remaining Work Done Completed Milestones
|
Planned Milestones Not Completed Physical % Complete
|
Duration % Complete Units % Complete Wrong Status
|
|
Planned
|
|
Planned Ahead Scheduled to Start
|
Planned Delayed Scheduled to Finish
|
Planned on Schedule |
|
|
In-Progress
|
|
Started Ahead Started Delayed In-Progress on Schedule
|
Days Early Days Late Average Days Early
|
Average Days Late Average Start Variance Discrepancy
|
Actually Started
|
|
Completed
|
|
Completed Ahead Completed Delayed Completed On-Schedule
|
Accelerated Days Variance Days Early
|
Days Late Average Days Early Average Days Late
|
Average Variance Actually Finished Took Longer than Planned
|
|
Baseline Compliance Analysis
|
|
Scheduled to Start Scheduled to Finish Started Finished
|
Started on Time Started Early Started Late Finished on Time
|
Finished Early Finished Late Started on time/Finished late Start Variance
|
Start Compliance Finish Variance Finish Compliance
|
|
Cost
|
|
Overrun $ Cost Underrun $ Cost Overrun
|
$ Total Cost $ Actual Cost $ Remaining Cost
|
$ Cost Discrepancy $ Budget Cost $ Cost per Day
|
|
|
Risk Inputs
|
|
Aggressive Conservative Questionable Ranges
|
Broad Risk Range Scope Uncertainty No Risk
|
Average Risk Range Total Risk Range No Downside
|
No Upside Avg Days Upside Avg Days Downside
|
|
Risk Exposure
|
|
High Criticality Hidden Paths Risk Hot Spots™
|
Schedule Risk Drivers High Contingency High Cost Drivers
|
Avg Risk Exposure Avg Duration Sensitivity Avg Criticality
|
Avg Cost Risk |
|
Earned Value
|
|
Cost Variance Schedule Variance SPI CPI Estimate at Complete
|
EAC (Using CPI Method) EAC (CPI/SPI) TCPI (Using BAC) TCPI(Using EAC) TCPI (EAC) to CPI
|
Planned Value Earned Value Actual Cost % Schedule % Spent
|
% Spent (EAC) VAC BAC |
|
Earned Schedule
|
|
SV(t) SPI(t)
|
|
|
|
|
Work/Resources
|
|
Overrun Work Underrun Work Overrun
|
Total Work Actual Work Remaining Work
|
Work Discrepancy Budget Work Summarized Work
|
Work per Day Missing Resources Resources
|
Industry Standards
|
|
DCMA 14 Point Assessment
|
|
Logic Leads Lags FS Relations
|
Hard Constraint High Float Negative Float High Duration
|
Invalid Dates Resources Missed Activities
|
CPLI BEI
|
| Learn More... |
| GAO Best Practices |
- Capturing all Activities
- Sequencing All Activities
- Assigning resources to all activities
- Establishing the duration of all activities
- Establishing the critical path for all activities
- Integrating schedule activities horizontally and vertically
- Establishing the critical path for all activities
- Identifying reasonable float between activities
- Conducting a schedule risk analysis
- Updating the schedule using logic and durations to determine the dates
|
| Learn More... |