Schedule Analysis

Free Trial  l   New Features  l  See Fuse in Action  l  Download Flyer  l  Request Pricing

The overall quality of a project schedule directly corresponds with project success or failure. However, weeding through thousands of activities and relationships trying to identify errors or flaws is a tedious and time-consuming process. Additionally, trying to use Microsoft Excel to analyze schedules leaves room for error and limits the analysis. Fuse has simplified project quality analysis and reporting to mere minutes through the use of pre-built schedule quality assessment metrics, which can be modified to meet project or company specific criteria.

Use Fuse to identify activities with high duration, negative float, open ends, or constraints within not only the project as a whole but within specific groups of activities such as WBS, contractor, location, or path. Additionally, use Fuse to run industry specific quality checks such as those from the DCMA and the GAO, or create a set of standard metrics to be used company-wide.

Example Schedule Analysis options within Fuse:

*All of  the 200+ project analysis checks included within Fuse are completely editable including formulas, criteria, thresholds, and tripwires.  For a complete list of the metrics included in Fuse click here